An Innovative Technology for Accelerated Bridge Construction—The Owner Designer Dilemma
Abstract
In the early 90's a breakthrough technology called Ultra-High Performance Concrete was being introduced to the bridge community as a new technology that could revolutionize bridge design and construction. The new material technology offered very durable new solutions, but required, new shapes, new design codes & standards, new precast fabrication methods and formworks. The new technology immediately met enthusiasm for use; however there were several barriers to entry as mentioned above. Bridge owners saw the value and so did bridge consultants; however the lack of design standards created increased risk to both owners and designers - a dilemma. This paper explains briefly the technology, applications, the risks of the owners and designers in using it, and how these risks were mitigated to develop innovative solutions.
Keywords: Bridges, Innovation, Ultra-High Performance Concrete, Ductility
How to Cite:
Perry, V. & Corvez, D., (2016) “An Innovative Technology for Accelerated Bridge Construction—The Owner Designer Dilemma”, International Interactive Symposium on Ultra-High Performance Concrete 1(1). doi: https://doi.org/10.31274/uhpc.2016.3
Downloads:
Download PDF
View PDF
491 Views
139 Downloads